OWNER/AGENCY DATE STARTED DATE COMPLETED  

NATURE OF WORKS

 

C.M. PANCHO CONSTRUCTION, INC.

Brgy. Sta. Clara, Sto. Tomas, Batangas

 

February 2019 August 2020 Drilling and blasting of hard rock materials for site development project with Adventureland International Leisure Corp.  Project Name: ECO-TOURISM LEISURE PARK, Km 82 Lipa-Alaminos Road.

Contracted Minimum Volume: 200,000 BCM

 

LORENZO CONSTRUCTION & DEVELOPMENT CORP.

San Miguel, Bulacan

March 2019 July 2020 Drilling and blasting of hard rock materials for the construction of Bulo Earthfill Dam and its Appurtenant structures

Implementing Agency: NIA

Contracted Minimum Volume: 100,000 BCM

 

ITP CONSTRUCTION, INC.

General Tinio, Nueva Ecija

January 2020 June 2020 Drilling and blasting of hard rock materials for the construction of Conveyance Canal Upper Tabuating Small Irrigation Project (UTSRIP).

Implementing Agency: NIA

Min. Contracted Vol 15,000 BCM

 

HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO., LTD./

ANGAT HYDROPOWER CORP.

Norzagaray, Bulacan

 

December 2016 July 2018 Drilling and blasting of hard rock materials for the rehabilitation of Angat Dam & Dykes Structures.

Minimum Contracted Volume: 990,000 BCM

 

ITP CONSTRUCTION, INC.

General Tinio, Nueva Ecija

June 2016 August 2018 Blasthole drilling for grouting purpose for Upper Tabuating River Irrigation Project.

Implementing Agency: NIA

 

ITP CONSTRUCTION, INC.

Bustos, Bulacan

April 2017 April 2018 Drilling of concrete for anchor bars re ground stabilization works project of ITP with National Irrigation Administration (NIA): Project Name: AARD Rehabilitation – Angat Afterbay Regulation Dam Rehabilitation.

 

 

APO GENERAL CONSTRUCTION

Natonin, Mt. Province

March 2017 August 2017 Drilling and blasting of hard rock materials for the road upgrading/improvement along Talubin-Barlig-Natonin-Paracelis-Calaccad Road, Mt. Province.  Station Limits: KO440+051 – KO440+968, KO 441+262 – KO442+344

Implementing Agency: DPWH-CAR

Minimum Contracted Volume: 15,000 BCM

 

TOKWING CONSTRUCTION CORP./

SCION CONSTRUCTION (JV)

Lobo, Batangas

 

March 2015 January 2017 Drilling and blasting operations of hardrock materials for the implementation of road construction project under the Department of Public Works and Highways (DPWH);

Project Name: Construction/Opening of Lobo – Malabrigo – Laiya – San Juan Road (Lobo – Malabrigo – Laiya Section)

Min. Contracted Volume: 15,000 BCM

 

RZ RONCAL CONSTRUCTION & TRADING

Maria Aurora, Aurora Province

July 2016 December 2016 Drilling and blasting of hard rock materials for the road widening and construction of the bridge approach of Villa Aurora Bridge along Nueva Ecija-Aurora Road, Brgy. Villa Maria Aurora, Municipality of Maria Aurora, Aurora Province.

Min. Contracted Volume: 20,000 BCM

Implementing Agency: DPWH Region 3

APO GENERAL CONSTRUCTION

Natonin, Mt. Province

May 2016 September 2016 Drilling and blasting of hard rock materials for the road development/improvement along Talubin-Barlig-Natonin-Paracelis Calaccad Road, Mt. Province.  Km. 443+054 to Km. 446+000

Implementing Agency: DPWH-CAR

Min. Contracted Volume: 20,000 BCM

ITP CONSTRUCTION, INC.

General Tinio, Nueva Ecija

June 2015 June 2016 Drilling and blasting of hard rock materials for the construction of Upper Tabuating Earthfill Dam and its appurtenant structures.

Implementing Agency: NIA

Minimum Contracted Volume : 30,000 BCM

SOLID ORE EARTHMOVING CONTRACTOR

Angat, Bulacan

October 2015 June 2016 Drilling and blasting operation of hard rock materials for quarry production (Prime Rock Quarry).

 

G.A. PINEDA CONSTRUCTION/

HANJIN HEAVY INDUSTRIES & CONSTRUCTION (HHIC-Phils.)

Subic, Zambales

 

March 2016 June 2016 Drilling and blasting of hard rock materials encountered in the site development project with Hanjin Heavy Industries & Construction (HHIC-Phils.)

Minimum Contracted

Volume : 20,000 BCM

GEOSOLID AGGREGATES, INC.

Doña Remedios Trinidad, Bulacan

 

November 2013 May 2016 Quarrying works inclusive of drilling, blasting and loading for production purpose.

Monthly Volume: 30,000 BCM

ORIENTAL ENERGY & POWER GENERATION CORP.

Madalag, Aklan

April 2015 November 2015 Drilling and blasting of hard rock materials encountered in the construction of 18MW Timbaban Hydroelectric Power Project.

Contracted Volume : 60,000 BCM

 

EARTH MOVING & DRILLING MACHINERY CORP./ HANJIN HEAVY INDUSTRIES & CONSTRUCTION (HHIC-Phils.)

Subic, Zambales

 

September 2015 November 2015

 

Drilling and blasting of hard rock materials encountered in the site development project with Hanjin Heavy Industries & Construction (HHIC-Phils.)

Minimum Contracted

Volume : 30,000 BCM

NEWINGTON BUILDERS, INC.

Barotac Viejo, Province of Iloilo

January 2015 August 2015 Drilling and blasting of hard rock materials encountered in the site development works for the construction of the Barotac Viejo Small Reservoir Irrigation Project (BVSRIP), a project of National Irrigation Administration (NIA)

Contracted Volume: 65,000 BCM

 

ENERGY WORLD PHILIPPINES, INC.

Pagbilao, Quezon

September 2014 May 2015 Drilling and blasting works for the site development of LNG Tank Storage Facility No.2.

Contracted Volume: 100,000 BCM

 

C.M. PANCHO CONSTRUCTION, INC.

Lipa, Batangas

 

October 2013 July 2014 Drilling and blasting of hard rock materials encountered during the implementation of a site excavation project for the development of parcels of land at Brgy. Antipolo del Sur, Lipa City, Batangas

Min. Contracted Volume: 100,000 BCM

 

C.M. PANCHO CONSTRUCTION, INC.

Aritao,  Nueva Vizcaya

 

June 2013 October 2013 Drilling and Blasting for road construction.

Project name: Construction of Dalton Pass Nueva Vizcaya San Jose-Aritao Road, Segment 5, Dalton Pass Section Eastern alternate route.

Implementing agency: DPWH

Minimum Contracted Volume: 5,000 BCM

FASTROCK MINERAL RESOURCES

Binangonan, Rizal

 

 

July  2013 August 2013 Drilling and Blasting of hard rock materials for the implementation of site excavation/ development project for the land development of parcels of land owned by Prime East Properties, Inc.

Minimum Contracted Volume: 10,000 BCM

 

C.E. FOUNDATION

San Jose Del Monte, Bulacan

 

March 2013 June 2013 Drilling services for jet grouting project.

Monthly Drilled Meterage:

6,000 meters

 

ENERGY WORLD CORPORATION LTD./ Consolidated Electric Power Asia Philippines Corporation

Brgy. Ibabang Polo, Pagbilao, Quezon

October 2011 May 2013 Drilling and Blasting of hard rock materials for the construction of the LNG Terminal and Storage Facility Project (Phase 1)

Monthly Volume: 50,000 BCM

 

RZ RONCAL CONSTRUCTION & TRADING

Bongabon, Nueva Ecija

November 2012 February 2013 Drilling & Blasting of hard rock materials for the road widening & rehabilitation project, Phase 1 (Km 155+400 to Km. 157+100) at Sitio, Nanduran, Bongabon, Nueva Ecija.

Implementing Agency: DPWH-Region 3

Contracted Volume: 10,000 BCM

 

LA CONCEPCION CONST. & DEV’T

Brgy. Bagong Nayon, Antipolo City

March 2012 November 2012 Blasthole Drilling in basalt quarry.

Monthly Drilled Meterage:  3,000 Meters

 

3K ROCK ENGINEERING

Benguet Province

 

October 2012

 

October 2012 Drilling & Blasting of hard rock materials for the road improvement of Gurel-Bokod-Kabayan-Bugias Road (Km. 312 + 500 to 330).

Implementing Agency: DPWH-CAR

Contracted Volume: 1,200 BCM

 

APO GENERAL CONSTRUCTION

Bugias, Benguet Province

 

July 2012 August 2012 Drilling & Blasting of hard rock materials for the road development/Improvement along the Acop-Kapangan-Kibunagn-Bakun Road Project (KM 345 + 470 to Km. 347 + 780).

Implementing Agency: DPWH-CAR.

Contracted Volume: 4,397 BCM

 

HANJIN HEAVY INDUSTRIES & CONSTRUCTION- PHIL., INC.

SBMA, Subic, Zamabales

May 2012 June 2012 Micropile Drilling services for pipe laying factory slope stabilization works.

 

AZTEC CONSTRUCTION CORP.

Brgy. San Rafael, Montalban Rodriguez, Rizal

March 2012 July 2012 Blasthole Drilling in basalt quarry.

Monthly Drilled Meterage:  3,000 Meters

TOPSTEEL BUILDERS

Taysan, Batangas

 

March 2010 July 2012 Drilling & Blasting of hard rock materials in an aggregate quarry.

Monthly Volume: 30,000 BCM

 

DONG MYEONG CONSTRUCTION, INC.

Subic Bay Freeport Zone

April 2012 May 2012 Anchorhole Drilling services for transmission tower.
APO GENERAL CONSTRUCTION

Bugias, Benguet Province

June 2010 August 2010 Drilling & Blasting of hard rock materials for the road development/improvement along the Abatan-Bugias section of the Gurel-Bokod-Kabayan-Bugias-Abatan Road project.

Implementing Agency: DPWH-CAR

Contracted Volume: 18,000 BCM

 

PADERNAL CONSTRUCTION CO., INC. February 2010 January 2011 Contract hauling of rock boulders for their Pasig- Marikina River Channel

Improvement Project

Total Volume:  16,000 BCM

 

UNILIME MINERALS

Brgy. Sta. Catalina, Atimonan, Quezon

October 2009

 

June 2010

 

Drilling & Blasting in limestone quarry.

Monthly volume:  10,000 BCM.

ALLTECH CONTRACTORS CORP/ EAGLE CEMENT CORPORATION

Brgy. Akle, San Ildefonso, Bulacan

June 2008

 

December 2009 Drilling & Blasting of hard rock materials for plant site development and quarry development.

Monthly volume:  100,000 BCM.

 

BASIC CEMENT CORPORATION/

NORTHERN CEMENT CORPORATION

Sison, Pangasinan

 

March 2009

 

September 2009

 

Blasthole Drilling in limestone quarry.

Monthly Drilled Meterage:  6,000 meters

 

HANJIN HEAVY INDUSTRIES, INC. (HHIC)

Laguindingan, Misamis Oriental

 

August 2008 March 2009

 

Controlled drilling & blasting of hard rock materials for the construction of the Laguindingan International Airport Development Project.  (Note: BM Equipment Resources, Inc. as a lead member of ADBC Joint Venture) Implementing government agency : DOTC

Total Volume: 1,500,000 BCM

NEW KANLAON CONSTRUCTION, INC.

Brgy. San Jose, Floridablanca, Pampanga

September 2008

 

December 2008

 

Drilling & Blasting of hard rock materials for the construction of

SCTEX Floridablanca Interchange.

Total Volume:  30,000 BCM

RISING SUN AGGREGATES CORP./

HANJIN HEAVY INDUSTRIES, INC. (HHIC)

SBMA, Subic, Zamabales

 

April 2007 August 2008

 

Drilling & Blasting of hard rock materials for the site development of HHIC’s Shipyard/shipbuilding facilities.

Contracted Volume: 1,200,000 BCM

 

IPM CONSTRUCTION & DEVELOPMENT CORP.

Brgy. San Guillermo, Morong, Rizal

June 2008 August 2008 Drilling & Blasting of hard rock materials for the construction of Morong Sanitary Landfill.

Contracted  Volume:  14,500 BCM

HG3 CONSTRUCTION AND DEVELOPMENT CORP.

San Jose Del Monte, Bulacan

May 2007

 

September 2007

 

Drilling & Controlled Blasting of hard rock materials for the site development of Towerville Subdivision.

Implementing Agency: NHA

Contracted Volume: 8,300 BCM

 

KAJIMA CORPORATION

(as a member of KOJM Joint Venture)

Porac, Pampanga

 

February 2006 April 2007

 

Drilling & Blasting of hard rock materials encountered in the construction of the Subic-Clark-Tarlac Expressway Project Package 1 (SCTEP Package 1) from Km. 19.20 to Km. 50.40

Contracted Volume: 1,130,000 BCM

 

INTEGRATED SOLID WASTE MANAGEMENT SPECIALIST, INC. (ISWIMS)

Bo. Lukutan, Brgy. San Isidro, Rodriguez, Rizal

 

May 2005

 

January 2007

 

Drilling & Controlled Blasting of hard rock materials encountered in the site development of the Montalban Solid Waste Disposal Facility. Implementing Agency: MMDA.

Monthly Volume: 25,000 cu.m.

 

NATIONAL IRRIGATION ADMINISTRATION

NIA REGION 4-Pila, Laguna          

Aborlan, Palawan

September  2007 May 2008 Drilling & Blasting of hard rock materials encountered in the construction of the Apurawan Communal Irrigation Project in Aborlan, Palawan.

 

JCR Aggregate Quarry

Brgy. Wawa, Rodriguez, Rizal

July 2002 February 2007

 

Contract Blasthole Drilling in an aggregate quarry.

 

LUKUTAN Aggregate Quarry

Brgy, San Isidro, Rodriquez, Rizal

July 2002 February 2007

 

Contract Blasthole Drilling in an aggregate quarry

 

BLUE ROCK AGGREGATES CORP.

Montalban, Rizal

April 2003 February 2007

 

Contract Drilling, Contract Hauling of run-of-quarry materials from quarry to crusher or crusher stockpile area and waste materials stockpile area.
PENTA OCEAN SHIMIZU TOA JOINT VENTURE

SBMA Port Development Project

SBMA, Subic, Zambales

 

September 2006

 

March  2007

 

Drilling & Blasting of hard rock materials used as fill materials for the reclamation and construction of the of the Subic Port Development Project.

Implementing Agency: SBMA

 

HG3 CONSTRUCTION & DEVELOPMENT CORP.

San Jose, Del Monte, Bulacan

 

October 2005

 

January 2006

 

Controlled Drilling & Blasting of hard rock materials encountered in the site development of Goldenville Townhomes.

Implementing Agency: NHA

R.D.POLICARPIO & CO., INC.

Samsonville Subdivision, Mabalacat, Pampanga

 

June 2005

 

December 2005

 

Controlled Drilling & Blasting of hard rock materials encountered in the site excavation for the Angat Water Utilization and Improvement Project Phase 1, 5.5 kms AQ-g Bypass Line.

Implementing Agency: MWSS

 

AIA CONSTRUCTION & DEVELOPMENT CORP.

SBMA Port Development Project

SBMA, Subic, Zambales

March 2005 June 2005 Drilling & Blasting of hard rock materials used as fill materials for the reclamation and construction of the new SBMA Port.
LEXBER, Inc.

Sablan,Tuba, Benguet

 

February 2003

 

March 2005 Slope Stabilization Employing Precision Drilling and Controlled Blasting at

Lexber Homes Metro-Baguio.

 

BROSTAN CONSTRUCTION & DEVELOPMENT CORPORATION

Santiago City, Isabela

 

December 2003

 

September 2004 Drilling & Blasting of hard rock materials in the construction of NIA-ADDALAM Irrigation Project in Aglipay, Quirino Province.

Implementing Office: DAR-NIA

 

Great Rock Construction & Development Corp.

Alaminos, Pangasinan

August 2002

(on and off)

 

June 2004 Controlled Drilling & Blasting in limestone quarry. Processed materials to be delivered at Mirant Philippines Coal Fired Power Plant in Sual, Pangasinan.

 

LEXBER, Inc.

Yagyagan,Tuba, Benguet

April 2002

 

July 2004 Controlled Drilling and Blasting for hard rock encountered in the land development of Regal-Lexber Homes in Yagyagan, Tuba, Benguet.

 

PELLETS MINERAL RESOURCES & DEV. CORP.

Jose Panganiban, Camarines Norte

 

September 2003 October 2003

 

Blasthole Drilling in an iron mine quarry situated at Jose Panganiban, Camarines Norte.

 

CAPRICORN ENTERPRISES/

C. BILOG CONSTRUCTION INC.

Aglipay, Quirino Province

August 2003 October 2003 Drilling & Blasting of hard rock materials in the construction of NIA-ADDALAM Irrigation Project in Aglipay, Quirino Province.

Implementing Agency: DAR-NIA

 

APO GENERAL CONST. INC.

Bo. Ambiong, Baguio City, Benguet

February  2003 June 2003

 

Drilling & Blasting of hard rock materials in the road construction/improvement of Bontoc-Banaue Road from Km. 383+310 to Km 383+620.

Implementing Agency:DPWH-CAR

 

 

MARCON’S BUILDERS

Tubaan Sur, Tuba, Benguet

December  2002 January  2003 Drilling & Blasting of hard rock materials in the road construction/widening of access road to Sto. Tomas Watershed in Tuba, Benguet. Implementing  office: DENR RDO1

 

Republic Cement Corporation

Norzagaray, Bulacan

June 2002

 

August 2003 Contract Hauling of limestone materials from quarry to Line 5 crusher.

 

APO General Const. Inc.

Kennon Road, Tuba, Benguet

November  2002 November 2002 Drilling & Blasting of hard rock materials in the re-grading of KM 225+160 to KM 225+420 in KENNON Road.

Implementing  office: DPWH RDO 1

 

Union Cement Corporation

Norzagaray, Bulacan

December 2001 February 2002 Contract Blasthole Drilling at Phase II- Limestone Quarry.

 

Northern Cement Corporation

Sison, Pangasinan

October 1999 September 2001 Controlled Drilling and Blasting for plant site development for proposed line 3 raw materials storage area and production drilling and blasting at the existing limestone quarry.

 

 

Sual Construction Corp./

Southern Electric Co.

Sual Power Station,

Sual, Pangasinan

January 1999 June 1999 Drilling & Blasting in an aggregate quarry in connection with the site development and various civil works for the construction of the 1200 MW coal fired power plant now owned by Mirant Philippines.

 

Island Quarry & Aggregates Corp.

Barrio Tagbac, Antipolo, Rizal

March 1998 February 1999 Surface Blasthole Drilling in basalt aggregate quarry.

 

Sual Construction Corp./

Southern Electric Company  (USA)

Sual Power Station, Sual, Pangasinan

 

November 1998 March 1999 Controlled Drilling and Blasting for slope stabilization and rock aggregate material.
Lexber, Inc.

Sablan, Benguet

January 1997 November 1998 Drilling & Blasting of hard rock encountered in the site development of LHMB Subdivision.

 

Nitro Asia Company, Inc.

Barrio San Roque, San Manuel, Pangasinan

March 1998 October 1998 Surface Blasthole Drilling for the construction of permanent access road to San Roque HydroElectric Dam.
Meralco Industrial Engineering Services Corp.  (MIESCOR)

Mauban, Quezon

April 1998 May 1998 Drilling & Blasting of hard rock materials encountered in the excavation of tower foundations of Tower Nos. 56 and 60 for the Quezon Power 230 KV Transmission Line Project of Meralco Ind’tl Engineering Services Corp. (MIESCOR).
Asia Konstrukt, Inc.

Mauban, Quezon

February 1998 April 1998 Contract Drilling for foundation and structural excavation of Quezon Power Plant (BECHTEL).
Leighton Contractors (Phils.) Inc. Of Australia

Sual, Pangasinan

December 1997 February 1998 Equipment Rental, Drilling and Controlled Blasting for mass excavation and foundation works for Southern Electric Company (USA) Coal Fired Power Plant.
The Zenitaka Corporation of Japan

Natividad, Pangasinan

March 1997 June 1997 Drilling and Blasting of hard rock materials in the construction of the National Irrigation Authority (NIA) Communal Irrigation Dam.
Hyundai Engineering Co. Ltd. Of  Korea/National Power Corporation                         Tayabas Sub-station, Tayabas, Quezon April 1997 November 1997 Structural/Foundation Drilling and Controlled Blasting of hard rock materials for the construction of Napocor Tayabas Substation.
Toyo Construction of Japan

Subic Bay Metropolitan Authority Subic, Zambales

March 1997 November 1997 Drilling and Controlled blasting for the construction of Subic Techno Industrial Park.

 

O.C. Deus Construction

 Barangay Matiuna, Tayabas, Quezon

October 1996 March 1997 Drilling and Controlled Blasting for the site development of NAPOCOR Tayabas sub-station.

 

R. Eusebio Development Corporation

Antipolo, Rizal

September 1995 April 1997 Drilling and Blasting of hard rock encountered in the construction of Marikina-Infanta Road Project of the DPWH.
Hopewell Holdings Ltd./

New Sampaguita Builders & Construction Corp.

Sual, Pangasinan

June 1995 June 1997 Equipment Rental, Drilling and Controlled Blasting for mass excavation and foundation works for Hopewell Holdings Coal Fired Thermal Plant.
Pantay Aggregates Corporation (PANACORP)

Brgy. San Jose, Antipolo, Rizal

May 1995 September 1997 Drilling and Blasting in an aggregate quarry.
Rizal Aggregates Corporation

Brgy. San Isidro

 

May 1995 December 1995 Drilling and Blasting in an aggregate quarry.
Rizal Cement Corporation

Binangonan, Rizal

May 1995 October 1995 Surface Blasthole Drilling in limestone quarry.
William Uy Construction

Real, Quezon

July 1994 October 1994 Drilling and Blasting for the construction of Famy- Infanta Highway.

 

Manila-Amman Construction & Equipment Services 

Quirino Highway

 

April 1994

 

January 1995

 

Drilling and Blasting of hard rock materials for road construction.
Phil. National Construction Corp.

Lipa, Batangas

April 1994 March 1995 Drilling and Controlled Blasting in an aggregate quarry.

 

Hardrock Aggregates, Inc.

Antipolo, Rizal

 

November

1993

(on and off)

May 1996 Plant Site and Quarry Development.
Hopewell Holdings Ltd./

New Sampaguita Builders & Construction Corp.

Pagbilao, Quezon

 

August 1993 June 1995 Equipment Rental, Contract Repair/ Rehabilitation Equipment, Drilling and Controlled Blasting for excavation of foundation works for Hopewell Holdings Coal Fired Thermal Plant.

 

Sta. Lucia Realty & Development Corp./A.L. De Castro Construction

 

April 1993 December

1994

Drilling and Blasting of hard rock formations in a subdivision development.
Calabar Aggregates Corporation

Brgy. Suplang, Tanauan, Batangas

February

1992

May 1992 Drilling and Blasting in an aggregate quarry
Crispa White Cement Corporation

Guinabasan, Asturias, Cebu

January

1992

 

July 1992 Drilling and Blasting in limestone quarry
A.M. Oreta Company, Inc.

La Mesa Dam, Novaliches

 

September 1991 December

1991

Drilling and Controlled Blasting
Unimasters Conglomerate

Tacloban City, Tacloban, Leyte

August 1990 November

1991

Drilling and Controlled Blasting for road construction.

 

Hi Cement Corporation

Norzagaray, Bulacan

August 1990 November

1993

Blasthole Drilling & Blasting, Diamond Drilling, Mine and Quarry Evaluation, Geological Mapping, Core Logging.

 

Mindanao Portland Cement

Iligan, Surigao

March 1989 March 1992 Drilling and Blasting of limestone materials.

 

Semirara Coal Corporation

Semirara. Caluya, Antique

 

March 1988

 

February 1991

 

Drilling and Blasting in large diameter drill holes with controlled charges for slope stabilization.

 