COMPLETED PROJECTS
[/vc_column_text][/vc_column][/vc_row][vc_row el_class=”tbd”][vc_column][vc_column_text]
OWNER/AGENCY | DATE STARTED | DATE COMPLETED |
NATURE OF WORKS
|
C.M. PANCHO CONSTRUCTION, INC.
Brgy. Sta. Clara, Sto. Tomas, Batangas
|
February 2019 | August 2020 | Drilling and blasting of hard rock materials for site development project with Adventureland International Leisure Corp. Project Name: ECO-TOURISM LEISURE PARK, Km 82 Lipa-Alaminos Road.
Contracted Minimum Volume: 200,000 BCM
|
LORENZO CONSTRUCTION & DEVELOPMENT CORP.
San Miguel, Bulacan |
March 2019 | July 2020 | Drilling and blasting of hard rock materials for the construction of Bulo Earthfill Dam and its Appurtenant structures
Implementing Agency: NIA Contracted Minimum Volume: 100,000 BCM
|
ITP CONSTRUCTION, INC.
General Tinio, Nueva Ecija |
January 2020 | June 2020 | Drilling and blasting of hard rock materials for the construction of Conveyance Canal Upper Tabuating Small Irrigation Project (UTSRIP).
Implementing Agency: NIA Min. Contracted Vol 15,000 BCM
|
HANJIN HEAVY INDUSTRIES & CONSTRUCTION CO., LTD./
ANGAT HYDROPOWER CORP. Norzagaray, Bulacan
|
December 2016 | July 2018 | Drilling and blasting of hard rock materials for the rehabilitation of Angat Dam & Dykes Structures.
Minimum Contracted Volume: 990,000 BCM
|
ITP CONSTRUCTION, INC.
General Tinio, Nueva Ecija |
June 2016 | August 2018 | Blasthole drilling for grouting purpose for Upper Tabuating River Irrigation Project.
Implementing Agency: NIA
|
ITP CONSTRUCTION, INC.
Bustos, Bulacan |
April 2017 | April 2018 | Drilling of concrete for anchor bars re ground stabilization works project of ITP with National Irrigation Administration (NIA): Project Name: AARD Rehabilitation – Angat Afterbay Regulation Dam Rehabilitation.
|
APO GENERAL CONSTRUCTION
Natonin, Mt. Province |
March 2017 | August 2017 | Drilling and blasting of hard rock materials for the road upgrading/improvement along Talubin-Barlig-Natonin-Paracelis-Calaccad Road, Mt. Province. Station Limits: KO440+051 – KO440+968, KO 441+262 – KO442+344
Implementing Agency: DPWH-CAR Minimum Contracted Volume: 15,000 BCM
|
TOKWING CONSTRUCTION CORP./
SCION CONSTRUCTION (JV) Lobo, Batangas
|
March 2015 | January 2017 | Drilling and blasting operations of hardrock materials for the implementation of road construction project under the Department of Public Works and Highways (DPWH);
Project Name: Construction/Opening of Lobo – Malabrigo – Laiya – San Juan Road (Lobo – Malabrigo – Laiya Section) Min. Contracted Volume: 15,000 BCM
|
RZ RONCAL CONSTRUCTION & TRADING
Maria Aurora, Aurora Province |
July 2016 | December 2016 | Drilling and blasting of hard rock materials for the road widening and construction of the bridge approach of Villa Aurora Bridge along Nueva Ecija-Aurora Road, Brgy. Villa Maria Aurora, Municipality of Maria Aurora, Aurora Province.
Min. Contracted Volume: 20,000 BCM Implementing Agency: DPWH Region 3 |
APO GENERAL CONSTRUCTION
Natonin, Mt. Province |
May 2016 | September 2016 | Drilling and blasting of hard rock materials for the road development/improvement along Talubin-Barlig-Natonin-Paracelis Calaccad Road, Mt. Province. Km. 443+054 to Km. 446+000
Implementing Agency: DPWH-CAR Min. Contracted Volume: 20,000 BCM |
ITP CONSTRUCTION, INC.
General Tinio, Nueva Ecija |
June 2015 | June 2016 | Drilling and blasting of hard rock materials for the construction of Upper Tabuating Earthfill Dam and its appurtenant structures.
Implementing Agency: NIA Minimum Contracted Volume : 30,000 BCM |
SOLID ORE EARTHMOVING CONTRACTOR
Angat, Bulacan |
October 2015 | June 2016 | Drilling and blasting operation of hard rock materials for quarry production (Prime Rock Quarry).
|
G.A. PINEDA CONSTRUCTION/
HANJIN HEAVY INDUSTRIES & CONSTRUCTION (HHIC-Phils.) Subic, Zambales
|
March 2016 | June 2016 | Drilling and blasting of hard rock materials encountered in the site development project with Hanjin Heavy Industries & Construction (HHIC-Phils.)
Minimum Contracted Volume : 20,000 BCM |
GEOSOLID AGGREGATES, INC.
Doña Remedios Trinidad, Bulacan
|
November 2013 | May 2016 | Quarrying works inclusive of drilling, blasting and loading for production purpose.
Monthly Volume: 30,000 BCM |
ORIENTAL ENERGY & POWER GENERATION CORP.
Madalag, Aklan |
April 2015 | November 2015 | Drilling and blasting of hard rock materials encountered in the construction of 18MW Timbaban Hydroelectric Power Project.
Contracted Volume : 60,000 BCM
|
EARTH MOVING & DRILLING MACHINERY CORP./ HANJIN HEAVY INDUSTRIES & CONSTRUCTION (HHIC-Phils.)
Subic, Zambales
|
September 2015 | November 2015
|
Drilling and blasting of hard rock materials encountered in the site development project with Hanjin Heavy Industries & Construction (HHIC-Phils.)
Minimum Contracted Volume : 30,000 BCM |
NEWINGTON BUILDERS, INC.
Barotac Viejo, Province of Iloilo |
January 2015 | August 2015 | Drilling and blasting of hard rock materials encountered in the site development works for the construction of the Barotac Viejo Small Reservoir Irrigation Project (BVSRIP), a project of National Irrigation Administration (NIA)
Contracted Volume: 65,000 BCM
|
ENERGY WORLD PHILIPPINES, INC.
Pagbilao, Quezon |
September 2014 | May 2015 | Drilling and blasting works for the site development of LNG Tank Storage Facility No.2.
Contracted Volume: 100,000 BCM
|
C.M. PANCHO CONSTRUCTION, INC.
Lipa, Batangas
|
October 2013 | July 2014 | Drilling and blasting of hard rock materials encountered during the implementation of a site excavation project for the development of parcels of land at Brgy. Antipolo del Sur, Lipa City, Batangas
Min. Contracted Volume: 100,000 BCM
|
C.M. PANCHO CONSTRUCTION, INC.
Aritao, Nueva Vizcaya
|
June 2013 | October 2013 | Drilling and Blasting for road construction.
Project name: Construction of Dalton Pass Nueva Vizcaya San Jose-Aritao Road, Segment 5, Dalton Pass Section Eastern alternate route. Implementing agency: DPWH Minimum Contracted Volume: 5,000 BCM |
FASTROCK MINERAL RESOURCES
Binangonan, Rizal
|
July 2013 | August 2013 | Drilling and Blasting of hard rock materials for the implementation of site excavation/ development project for the land development of parcels of land owned by Prime East Properties, Inc.
Minimum Contracted Volume: 10,000 BCM
|
C.E. FOUNDATION
San Jose Del Monte, Bulacan
|
March 2013 | June 2013 | Drilling services for jet grouting project.
Monthly Drilled Meterage: 6,000 meters
|
ENERGY WORLD CORPORATION LTD./ Consolidated Electric Power Asia Philippines Corporation
Brgy. Ibabang Polo, Pagbilao, Quezon |
October 2011 | May 2013 | Drilling and Blasting of hard rock materials for the construction of the LNG Terminal and Storage Facility Project (Phase 1)
Monthly Volume: 50,000 BCM
|
RZ RONCAL CONSTRUCTION & TRADING
Bongabon, Nueva Ecija |
November 2012 | February 2013 | Drilling & Blasting of hard rock materials for the road widening & rehabilitation project, Phase 1 (Km 155+400 to Km. 157+100) at Sitio, Nanduran, Bongabon, Nueva Ecija.
Implementing Agency: DPWH-Region 3 Contracted Volume: 10,000 BCM
|
LA CONCEPCION CONST. & DEV’TBrgy. Bagong Nayon, Antipolo City |
March 2012 | November 2012 | Blasthole Drilling in basalt quarry.
Monthly Drilled Meterage: 3,000 Meters
|
3K ROCK ENGINEERING
Benguet Province
|
October 2012
|
October 2012 | Drilling & Blasting of hard rock materials for the road improvement of Gurel-Bokod-Kabayan-Bugias Road (Km. 312 + 500 to 330).
Implementing Agency: DPWH-CAR Contracted Volume: 1,200 BCM
|
APO GENERAL CONSTRUCTION
Bugias, Benguet Province
|
July 2012 | August 2012 | Drilling & Blasting of hard rock materials for the road development/Improvement along the Acop-Kapangan-Kibunagn-Bakun Road Project (KM 345 + 470 to Km. 347 + 780).
Implementing Agency: DPWH-CAR. Contracted Volume: 4,397 BCM
|
HANJIN HEAVY INDUSTRIES & CONSTRUCTION- PHIL., INC.SBMA, Subic, Zamabales |
May 2012 | June 2012 | Micropile Drilling services for pipe laying factory slope stabilization works.
|
AZTEC CONSTRUCTION CORP.Brgy. San Rafael, Montalban Rodriguez, Rizal |
March 2012 | July 2012 | Blasthole Drilling in basalt quarry.
Monthly Drilled Meterage: 3,000 Meters |
TOPSTEEL BUILDERS
Taysan, Batangas |
March 2010 | July 2012 | Drilling & Blasting of hard rock materials in an aggregate quarry.
Monthly Volume: 30,000 BCM
|
DONG MYEONG CONSTRUCTION, INC.
Subic Bay Freeport Zone |
April 2012 | May 2012 | Anchorhole Drilling services for transmission tower. |
APO GENERAL CONSTRUCTION
Bugias, Benguet Province |
June 2010 | August 2010 | Drilling & Blasting of hard rock materials for the road development/improvement along the Abatan-Bugias section of the Gurel-Bokod-Kabayan-Bugias-Abatan Road project.
Implementing Agency: DPWH-CAR Contracted Volume: 18,000 BCM
|
PADERNAL CONSTRUCTION CO., INC. | February 2010 | January 2011 | Contract hauling of rock boulders for their Pasig- Marikina River Channel
Improvement Project Total Volume: 16,000 BCM
|
UNILIME MINERALSBrgy. Sta. Catalina, Atimonan, Quezon |
October 2009
|
June 2010
|
Drilling & Blasting in limestone quarry.
Monthly volume: 10,000 BCM. |
ALLTECH CONTRACTORS CORP/ EAGLE CEMENT CORPORATIONBrgy. Akle, San Ildefonso, Bulacan |
June 2008
|
December 2009 | Drilling & Blasting of hard rock materials for plant site development and quarry development.
Monthly volume: 100,000 BCM.
|
BASIC CEMENT CORPORATION/NORTHERN CEMENT CORPORATIONSison, Pangasinan
|
March 2009
|
September 2009
|
Blasthole Drilling in limestone quarry.
Monthly Drilled Meterage: 6,000 meters
|
HANJIN HEAVY INDUSTRIES, INC. (HHIC)
Laguindingan, Misamis Oriental |
August 2008 | March 2009
|
Controlled drilling & blasting of hard rock materials for the construction of the Laguindingan International Airport Development Project. (Note: BM Equipment Resources, Inc. as a lead member of ADBC Joint Venture) Implementing government agency : DOTC
Total Volume: 1,500,000 BCM |
NEW KANLAON CONSTRUCTION, INC.Brgy. San Jose, Floridablanca, Pampanga |
September 2008
|
December 2008
|
Drilling & Blasting of hard rock materials for the construction of
SCTEX Floridablanca Interchange. Total Volume: 30,000 BCM |
RISING SUN AGGREGATES CORP./
HANJIN HEAVY INDUSTRIES, INC. (HHIC) SBMA, Subic, Zamabales |
April 2007 | August 2008
|
Drilling & Blasting of hard rock materials for the site development of HHIC’s Shipyard/shipbuilding facilities.
Contracted Volume: 1,200,000 BCM
|
IPM CONSTRUCTION & DEVELOPMENT CORP.Brgy. San Guillermo, Morong, Rizal |
June 2008 | August 2008 | Drilling & Blasting of hard rock materials for the construction of Morong Sanitary Landfill.
Contracted Volume: 14,500 BCM |
HG3 CONSTRUCTION AND DEVELOPMENT CORP.San Jose Del Monte, Bulacan |
May 2007
|
September 2007
|
Drilling & Controlled Blasting of hard rock materials for the site development of Towerville Subdivision.
Implementing Agency: NHA Contracted Volume: 8,300 BCM
|
KAJIMA CORPORATION
(as a member of KOJM Joint Venture) Porac, Pampanga |
February 2006 | April 2007
|
Drilling & Blasting of hard rock materials encountered in the construction of the Subic-Clark-Tarlac Expressway Project Package 1 (SCTEP Package 1) from Km. 19.20 to Km. 50.40
Contracted Volume: 1,130,000 BCM
|
INTEGRATED SOLID WASTE MANAGEMENT SPECIALIST, INC. (ISWIMS)Bo. Lukutan, Brgy. San Isidro, Rodriguez, Rizal
|
May 2005
|
January 2007
|
Drilling & Controlled Blasting of hard rock materials encountered in the site development of the Montalban Solid Waste Disposal Facility. Implementing Agency: MMDA.
Monthly Volume: 25,000 cu.m.
|
NATIONAL IRRIGATION ADMINISTRATION
NIA REGION 4-Pila, LagunaAborlan, Palawan |
September 2007 | May 2008 | Drilling & Blasting of hard rock materials encountered in the construction of the Apurawan Communal Irrigation Project in Aborlan, Palawan.
|
JCR Aggregate Quarry
Brgy. Wawa, Rodriguez, Rizal |
July 2002 | February 2007
|
Contract Blasthole Drilling in an aggregate quarry.
|
LUKUTAN Aggregate Quarry
Brgy, San Isidro, Rodriquez, Rizal |
July 2002 | February 2007
|
Contract Blasthole Drilling in an aggregate quarry
|
BLUE ROCK AGGREGATES CORP.
Montalban, Rizal |
April 2003 | February 2007
|
Contract Drilling, Contract Hauling of run-of-quarry materials from quarry to crusher or crusher stockpile area and waste materials stockpile area. |
PENTA OCEAN SHIMIZU TOA JOINT VENTURE
SBMA Port Development Project SBMA, Subic, Zambales
|
September 2006
|
March 2007
|
Drilling & Blasting of hard rock materials used as fill materials for the reclamation and construction of the of the Subic Port Development Project.
Implementing Agency: SBMA
|
HG3 CONSTRUCTION & DEVELOPMENT CORP.
San Jose, Del Monte, Bulacan
|
October 2005
|
January 2006
|
Controlled Drilling & Blasting of hard rock materials encountered in the site development of Goldenville Townhomes.
Implementing Agency: NHA |
R.D.POLICARPIO & CO., INC.
Samsonville Subdivision, Mabalacat, Pampanga
|
June 2005
|
December 2005
|
Controlled Drilling & Blasting of hard rock materials encountered in the site excavation for the Angat Water Utilization and Improvement Project Phase 1, 5.5 kms AQ-g Bypass Line.
Implementing Agency: MWSS
|
AIA CONSTRUCTION & DEVELOPMENT CORP.
SBMA Port Development Project SBMA, Subic, Zambales |
March 2005 | June 2005 | Drilling & Blasting of hard rock materials used as fill materials for the reclamation and construction of the new SBMA Port. |
LEXBER, Inc.
Sablan,Tuba, Benguet
|
February 2003
|
March 2005 | Slope Stabilization Employing Precision Drilling and Controlled Blasting at
Lexber Homes Metro-Baguio.
|
BROSTAN CONSTRUCTION & DEVELOPMENT CORPORATION
Santiago City, Isabela
|
December 2003
|
September 2004 | Drilling & Blasting of hard rock materials in the construction of NIA-ADDALAM Irrigation Project in Aglipay, Quirino Province.
Implementing Office: DAR-NIA
|
Great Rock Construction & Development Corp.
Alaminos, Pangasinan |
August 2002
(on and off)
|
June 2004 | Controlled Drilling & Blasting in limestone quarry. Processed materials to be delivered at Mirant Philippines Coal Fired Power Plant in Sual, Pangasinan.
|
LEXBER, Inc.
Yagyagan,Tuba, Benguet |
April 2002
|
July 2004 | Controlled Drilling and Blasting for hard rock encountered in the land development of Regal-Lexber Homes in Yagyagan, Tuba, Benguet.
|
PELLETS MINERAL RESOURCES & DEV. CORP.
Jose Panganiban, Camarines Norte
|
September 2003 | October 2003
|
Blasthole Drilling in an iron mine quarry situated at Jose Panganiban, Camarines Norte.
|
CAPRICORN ENTERPRISES/
C. BILOG CONSTRUCTION INC. Aglipay, Quirino Province |
August 2003 | October 2003 | Drilling & Blasting of hard rock materials in the construction of NIA-ADDALAM Irrigation Project in Aglipay, Quirino Province.
Implementing Agency: DAR-NIA
|
APO GENERAL CONST. INC.
Bo. Ambiong, Baguio City, Benguet |
February 2003 | June 2003
|
Drilling & Blasting of hard rock materials in the road construction/improvement of Bontoc-Banaue Road from Km. 383+310 to Km 383+620.
Implementing Agency:DPWH-CAR
|
MARCON’S BUILDERS
Tubaan Sur, Tuba, Benguet |
December 2002 | January 2003 | Drilling & Blasting of hard rock materials in the road construction/widening of access road to Sto. Tomas Watershed in Tuba, Benguet. Implementing office: DENR RDO1
|
Republic Cement Corporation
Norzagaray, Bulacan |
June 2002
|
August 2003 | Contract Hauling of limestone materials from quarry to Line 5 crusher.
|
APO General Const. Inc.
Kennon Road, Tuba, Benguet |
November 2002 | November 2002 | Drilling & Blasting of hard rock materials in the re-grading of KM 225+160 to KM 225+420 in KENNON Road.
Implementing office: DPWH RDO 1
|
Union Cement Corporation
Norzagaray, Bulacan |
December 2001 | February 2002 | Contract Blasthole Drilling at Phase II- Limestone Quarry.
|
Northern Cement Corporation
Sison, Pangasinan |
October 1999 | September 2001 | Controlled Drilling and Blasting for plant site development for proposed line 3 raw materials storage area and production drilling and blasting at the existing limestone quarry.
|
Sual Construction Corp./
Southern Electric Co. Sual Power Station, Sual, Pangasinan |
January 1999 | June 1999 | Drilling & Blasting in an aggregate quarry in connection with the site development and various civil works for the construction of the 1200 MW coal fired power plant now owned by Mirant Philippines.
|
Island Quarry & Aggregates Corp.
Barrio Tagbac, Antipolo, Rizal |
March 1998 | February 1999 | Surface Blasthole Drilling in basalt aggregate quarry.
|
Sual Construction Corp./
Southern Electric Company (USA) Sual Power Station, Sual, Pangasinan
|
November 1998 | March 1999 | Controlled Drilling and Blasting for slope stabilization and rock aggregate material. |
Lexber, Inc.
Sablan, Benguet |
January 1997 | November 1998 | Drilling & Blasting of hard rock encountered in the site development of LHMB Subdivision.
|
Nitro Asia Company, Inc.
Barrio San Roque, San Manuel, Pangasinan |
March 1998 | October 1998 | Surface Blasthole Drilling for the construction of permanent access road to San Roque HydroElectric Dam. |
Meralco Industrial Engineering Services Corp. (MIESCOR)
Mauban, Quezon |
April 1998 | May 1998 | Drilling & Blasting of hard rock materials encountered in the excavation of tower foundations of Tower Nos. 56 and 60 for the Quezon Power 230 KV Transmission Line Project of Meralco Ind’tl Engineering Services Corp. (MIESCOR). |
Asia Konstrukt, Inc.
Mauban, Quezon |
February 1998 | April 1998 | Contract Drilling for foundation and structural excavation of Quezon Power Plant (BECHTEL). |
Leighton Contractors (Phils.) Inc. Of Australia
Sual, Pangasinan |
December 1997 | February 1998 | Equipment Rental, Drilling and Controlled Blasting for mass excavation and foundation works for Southern Electric Company (USA) Coal Fired Power Plant. |
The Zenitaka Corporation of Japan
Natividad, Pangasinan |
March 1997 | June 1997 | Drilling and Blasting of hard rock materials in the construction of the National Irrigation Authority (NIA) Communal Irrigation Dam. |
Hyundai Engineering Co. Ltd. Of Korea/National Power Corporation Tayabas Sub-station, Tayabas, Quezon | April 1997 | November 1997 | Structural/Foundation Drilling and Controlled Blasting of hard rock materials for the construction of Napocor Tayabas Substation. |
Toyo Construction of Japan
Subic Bay Metropolitan Authority Subic, Zambales |
March 1997 | November 1997 | Drilling and Controlled blasting for the construction of Subic Techno Industrial Park.
|
O.C. Deus Construction
Barangay Matiuna, Tayabas, Quezon |
October 1996 | March 1997 | Drilling and Controlled Blasting for the site development of NAPOCOR Tayabas sub-station.
|
R. Eusebio Development Corporation
Antipolo, Rizal |
September 1995 | April 1997 | Drilling and Blasting of hard rock encountered in the construction of Marikina-Infanta Road Project of the DPWH. |
Hopewell Holdings Ltd./
New Sampaguita Builders & Construction Corp. Sual, Pangasinan |
June 1995 | June 1997 | Equipment Rental, Drilling and Controlled Blasting for mass excavation and foundation works for Hopewell Holdings Coal Fired Thermal Plant. |
Pantay Aggregates Corporation (PANACORP)
Brgy. San Jose, Antipolo, Rizal |
May 1995 | September 1997 | Drilling and Blasting in an aggregate quarry. |
Rizal Aggregates Corporation
Brgy. San Isidro
|
May 1995 | December 1995 | Drilling and Blasting in an aggregate quarry. |
Rizal Cement Corporation
Binangonan, Rizal |
May 1995 | October 1995 | Surface Blasthole Drilling in limestone quarry. |
William Uy Construction
Real, Quezon |
July 1994 | October 1994 | Drilling and Blasting for the construction of Famy- Infanta Highway.
|
Manila-Amman Construction & Equipment Services
Quirino Highway
|
April 1994
|
January 1995
|
Drilling and Blasting of hard rock materials for road construction. |
Phil. National Construction Corp.
Lipa, Batangas |
April 1994 | March 1995 | Drilling and Controlled Blasting in an aggregate quarry.
|
Hardrock Aggregates, Inc.
Antipolo, Rizal
|
November
1993 (on and off) |
May 1996 | Plant Site and Quarry Development. |
Hopewell Holdings Ltd./
New Sampaguita Builders & Construction Corp. Pagbilao, Quezon
|
August 1993 | June 1995 | Equipment Rental, Contract Repair/ Rehabilitation Equipment, Drilling and Controlled Blasting for excavation of foundation works for Hopewell Holdings Coal Fired Thermal Plant.
|
Sta. Lucia Realty & Development Corp./A.L. De Castro Construction
|
April 1993 | December
1994 |
Drilling and Blasting of hard rock formations in a subdivision development. |
Calabar Aggregates Corporation
Brgy. Suplang, Tanauan, Batangas |
February
1992 |
May 1992 | Drilling and Blasting in an aggregate quarry |
Crispa White Cement Corporation
Guinabasan, Asturias, Cebu |
January
1992
|
July 1992 | Drilling and Blasting in limestone quarry |
A.M. Oreta Company, Inc.
La Mesa Dam, Novaliches
|
September 1991 | December
1991 |
Drilling and Controlled Blasting |
Unimasters Conglomerate
Tacloban City, Tacloban, Leyte |
August 1990 | November
1991 |
Drilling and Controlled Blasting for road construction.
|
Hi Cement Corporation
Norzagaray, Bulacan |
August 1990 | November
1993 |
Blasthole Drilling & Blasting, Diamond Drilling, Mine and Quarry Evaluation, Geological Mapping, Core Logging.
|
Mindanao Portland Cement
Iligan, Surigao |
March 1989 | March 1992 | Drilling and Blasting of limestone materials.
|
Semirara Coal Corporation
Semirara. Caluya, Antique
|
March 1988
|
February 1991
|
Drilling and Blasting in large diameter drill holes with controlled charges for slope stabilization.
|